
Project Astaldi S.p.A. - Taranto Port
Description Driving of diaphragms and tubes with Dieseko Group PVE 300 M vibrator for dredging operations in the port of Taranto (Puglia).
The expansion of the port of Taranto allowed the construction of containment structures. The work was carried out for Astaldi S.p.A. with the insertion of piles - diaphragms measuring 12 metres. The monopiles are spaced around 9 metres apart. The necessary depth was at least two metres into the clays of the designated site.